88220, Carlsbad, New Mexico - May 18, 2021
Tree Removal$362.52 - $448.38 fixed fee for standing tree (less than 30 ft) Cost assumes a typical tree removal. Estimate accounts for removing a standing tree (20-30 ft tall) from a residential property. Price does not account for permit fees, emergency calls, damaged or diseased trees, trees taller than 30 ft, stump grinding, trees located near power lines, and splitting firewood.
Reported by: ProMatcher Research Team |
88220, Carlsbad, New Mexico - May 7, 2021
Tree Stump Removal$3.10 - $3.34 per linear inch (diameter of stump) Includes pricing for stump grinding. Cost takes into account grinding of stump 6-8 inches below the ground. Excludes minimum service charges, surface roots, discounts for multiple stumps, or travel surcharges.
Reported by: ProMatcher Research Team |
88220, Carlsbad, New Mexico - August 3, 2018
Protecting Trees and Shrubs from Disease$52.28 - $53.76 per trunk injection Estimate takes into account labor. It also includes a single trunk injection to prevent or stop the spread of tree disease. Cost estimate excludes additional trees, spray applications, and larger trees (30+ feet tall).
Reported by: ProMatcher Research Team |
88220, Carlsbad, New Mexico - June 25, 2018
Tree Trimming and Pruning$118.77 - $147.11 per hour (two-man crew) Labor for tree trimming services is included. Cost does include removing dead or dying branches and limbs from a small or medium-sized tree. Typically there is an increased cost for trees near power lines, disposal fees, trees greater than 30 ft tall, wood chipping, tree removal, and tree disease treatment.
Reported by: ProMatcher Research Team |
88220, Carlsbad, New Mexico - June 1, 2018
Land and Lot Clearing$1,144.80 - $2,337.30 per acre This estimated price includes land clearing labor. Cost accounts for clearing moderate brush and small trees on flat or slightly sloped land. Does not include disposal fees, stump removal, mature tree removal, structure demolition, heavily sloped terrain, or site preparation and grading for house construction.
Reported by: ProMatcher Research Team |